X’Pertus® designs mobile hull-cleaning wastewater treatment units housed in 10-foot or 20-foot containers, engineered according to the actual wastewater characteristics at your slipway and the flow rates of your high-pressure cleaning equipment.
Conteneur de gestion des effluents de carénage dans une cale

Do you carry out hull maintenance on vessels ranging from 20 to 150 metres at a rented slipway, but hesitate to invest in permanent civil engineering works?

  • We have examined the environmental risks and regulatory requirements applicable in 2026 in our article on shipyard hull-cleaning wastewater.
  • Now, let’s focus on the solution: collecting, treating and recycling wastewater without extensive construction work.

Key Takeaways

  • Our solution: A ready-to-deploy, containerised hull-washing and maintenance wastewater treatment system, available in a 10-foot container, incorporating wastewater collection, pumping, filtration, oil-water separation, storage and optional water recycling. The unit can be installed alongside the slipway without major construction work and relocated whenever required.
  • System sizing: Each hull-cleaning wastewater treatment unit is engineered based on the laboratory analysis of a five-litre wastewater sample and the combined instantaneous flow rate of the cleaning equipment, rather than relying on a standardised design.
  • Treatment process: Washwater can undergo up to five treatment stages: removal of suspended solids, separation of hydrocarbons, fine-particle filtration, removal of dissolved contaminants and, where water recycling is required, disinfection.
  • Commercial advantage: Documented hull-cleaning wastewater management is becoming an increasingly important requirement in maritime tenders and procurement specifications.

Which Hull-Cleaning Wastewater Treatment System Is Suitable for Vessels Between 20 and 150 Metres?

The appropriate hull-cleaning wastewater treatment system consists of a sequence of treatment stages selected according to the wastewater analysis results and designed to handle the combined flow rate of two or three high-pressure washers operating simultaneously.

A shipyard occasionally servicing a 30-metre vessel has very different requirements from a facility continuously handling vessels exceeding 100 metres.

  • Although the wastewater may contain similar types of contaminants, the required hydraulic capacity and treatment configuration will differ significantly.
  • Depending on the analytical results, the treatment unit may incorporate some or all of the following technologies: belt filtration, oil-water separation, fine filtration, activated carbon adsorption using 30-, 60- or 100-litre vessels, followed by ozone or ultraviolet (UV) treatment.
Treatment Stage Contaminants Removed or Managed Recommended Application Key Operational Considerations
Collection and pumping Collection of washwater generated around the vessel Required for all installations Pump capacity must match the instantaneous flow rate of the pressure washers rather than the average daily flow
Belt filtration Suspended solids, shell fragments, sand and paint flakes High solids loading and heavily fouled hulls Collected solids must be disposed of through an appropriate waste management route
Oil-water separator Free-phase hydrocarbons, oils and grease Mechanical maintenance operations, bilge water and accidental oil leaks Scheduled maintenance, oil and sludge removal, and safe operator access
20-micron followed by 5-micron filtration Fine suspended particles and antifouling paint pigments Upstream of activated carbon treatment to protect the adsorption media Differential pressure monitoring to detect filter clogging
Activated carbon adsorption Selected dissolved contaminants, including certain biocides, metals and detergents Antifouling contamination and applications requiring compliance with copper and zinc discharge limits Adsorption capacity must be determined according to the measured contaminant loading
Ozone or UV treatment Oxidisable compounds and microbiological contamination, depending on the technology Water recycling and operator exposure risk management Enclosed treatment reactors, ventilation and residual ozone management where applicable

How Should a Hull-Cleaning Wastewater Treatment Area Be Sized?

The design of a hull-cleaning wastewater treatment installation begins with laboratory analysis of approximately five litres of representative washwater and an assessment of the combined flow rates of all high-pressure washers operating simultaneously.

X’Pertus®, your specialist supplier of wastewater management equipment, coordinates the wastewater analysis.

  • The analytical results determine which contaminants must be removed, separated or filtered, as well as the hydraulic treatment capacity required and, where recycling is planned, the volume of treated water that must be returned to the washing process.
  • Applicable discharge limits are defined by the site-specific prefectural operating permit, with reference to the French Ministerial Order of 2 February 1998, governing discharges from regulated industrial installations (Installations Classées pour la Protection de l’Environnement, ICPE).
  • A common design mistake is specifying equipment capable of processing a substantial daily wastewater volume but unable to accommodate the peak flow generated by three pressure washers operating simultaneously for twenty minutes.

The result is wastewater accumulation, interruptions to cleaning and painting operations, and reduced slipway availability.

When wastewater treatment is interrupted, vessel maintenance operations can also come to a standstill.

  • The treatment unit must therefore operate continuously at a flow rate compatible with the washing equipment.

How Can Hull-Washing Wastewater Be Collected Around a Vessel?

Flexible containment areas positioned beneath the working zone, or temporary containment berms installed directly on the existing slipway, channel washwater towards the pumping system without requiring excavation or permanent civil engineering work.

  • Effective wastewater collection is frequently underestimated, despite being the first and most critical stage of the treatment process.
  • Even the most advanced wastewater treatment unit cannot prevent environmental contamination if a significant proportion of the washwater escapes into the harbour basin before being collected.

In practical terms:

  • Flexible containment berms and portable containment systems can establish a controlled washing area within a few hours.
  • Flexible containment provides a continuous barrier where timber boards or rigid temporary edges may allow wastewater leakage.
  • The containment layout can be adapted to accommodate site traffic, including mobile access platforms, forklifts and other handling equipment.

Why Choose a Mobile Containerised Unit Instead of a Fixed Installation?

A mobile hull-cleaning wastewater treatment unit housed in a 10-foot or 20-foot container can move with your business, whether you relocate to another slipway, secure a new maintenance contract or transfer operations to a different site.

  • Many shipyard operators conduct their activities on slipways or technical areas they do not own.
  • Investing in a permanent wastewater treatment installation on leased port infrastructure may mean financing equipment that ultimately remains with the port authority or facility owner.
  • By choosing a skid-mounted or containerised treatment system, you invest in equipment that remains part of your own operational assets.
  • When a new contract requires relocation, the treatment unit can be loaded onto a truck and transported to another facility.
  • If operational requirements change, the modular treatment process can be reconfigured by adding, replacing or modifying individual treatment stages rather than installing an entirely new system.

Our most compact configuration is presented on the 10-foot containerised washing and hull-cleaning treatment system product page.

Bilge Water Treatment: How Can the Volume Requiring Off-Site Disposal Be Reduced?

An upstream skid-mounted oil-water separator separates the hydrocarbon phase from the aqueous phase, reducing the volume of waste requiring disposal through authorised hazardous waste treatment facilities.

Bilge water presents a different treatment challenge from hull-washing wastewater.

  • It typically contains substantial quantities of water mixed with smaller amounts of oil, grease and petroleum hydrocarbons.
  • Sending the entire collected volume to a specialist waste treatment facility can result in unnecessary transportation and treatment costs, particularly where a portion of the water could be treated separately.
  • The potential savings must be assessed on a case-by-case basis, taking into account wastewater composition, total volumes, disposal costs and site-specific regulatory requirements.

However, at shipyards servicing vessels continuously, the financial benefits of reducing hazardous waste volumes can become significant.

Discover our equipment range for hydrocarbon- and grease-contaminated wastewater treatment.

How Can Treated Hull-Cleaning Wastewater Become a Commercial Advantage?

A shipyard capable of demonstrating to vessel owners how washwater is collected, treated, discharged or recycled can turn an environmental compliance obligation into a genuine competitive advantage.

Across the maritime, construction and railway sectors, procurement specifications increasingly include requirements relating to wastewater discharge control, washwater recovery and environmental traceability.

  • When effective wastewater management becomes a mandatory tender requirement, hull-cleaning wastewater treatment is no longer simply an added benefit.
  • It becomes an essential condition for qualifying for certain contracts.
  • The cost of investing in wastewater treatment equipment should therefore not be assessed solely against the potential financial consequences of non-compliance.

It should also be considered in relation to the commercial opportunities it creates and the contracts it helps secure or retain.

Expert Advice from François Rivalland, Founder of X’Pertus®

“When designing a treatment unit, I always ask the same question: who will replace the filters, at what working height, and using which tools?

If the answer involves an operator leaning over a sludge tank while wearing a respirator, then we have missed an essential design requirement.

The process should operate as a closed system, with connections designed to minimise direct contact with wastewater, and any ozone generator properly enclosed and ventilated.

Personal protective equipment (PPE) should be selected after assessing the residual risks, based on the Safety Data Sheets (SDS) of the substances actually identified in the wastewater sample.

Our design philosophy can be summarised in one sentence: treat the wastewater without introducing additional hazards or operational constraints for the people operating the system.”

Frequently Asked Questions About Mobile Hull-Cleaning Wastewater Treatment

Are Civil Engineering Works Required to Install a Mobile Hull-Cleaning Wastewater Treatment Unit?

The containerised treatment unit and flexible containment system are designed for deployment without excavation or major civil engineering works, and generally without the construction requirements associated with a permanent installation.

The installation requires a load-bearing surface suitable for the container, an electrical power supply and a wastewater collection and pumping point.

The flexible containment system is installed directly on the existing slipway and can be repositioned whenever the operational layout changes.

Can Treated Hull-Cleaning Wastewater Be Recycled for Subsequent Washing Operations?

Yes, provided that the treatment process includes appropriate contaminant removal, such as activated carbon adsorption, followed by UV or ozone disinfection where required, together with final treated-water quality monitoring.

Water recycling reduces freshwater consumption and can help maintain cleaning operations during periods of water-use restrictions, subject to applicable requirements.

The recycled-water treatment process must be designed to achieve a water quality suitable for the intended reuse, taking into account operator exposure during high-pressure spraying.

How Many High-Pressure Washers Can Operate Simultaneously with One Treatment Unit?

The number depends on the system’s design capacity, which is determined by the combined instantaneous flow rate of all high-pressure cleaning lances operating simultaneously.

  • This peak demand determines the sizing of the pumps, filtration equipment and associated treatment stages.
  • Simply tell us how many high-pressure washers may operate simultaneously during the most intensive washing period and specify their respective flow rates.
  • We design the system for this peak operating condition, not for the average daily wastewater generation rate.

What Happens to the Treatment Unit If I Move to Another Slipway or Lose Access to My Current Site?

The treatment unit can move with you.

  • A 10-foot or 20-foot containerised system can be loaded onto a truck, transported and connected at a new operating location.
  • This is a major advantage of choosing mobile equipment rather than building a permanent concrete installation on leased land.
  • If the new activity generates wastewater with different characteristics, a new laboratory analysis can be performed and the modular treatment configuration adjusted accordingly.

What Personal Protective Equipment Is Required for Hull-Cleaning Operators?

PPE requirements must be determined through an occupational risk assessment and the relevant Safety Data Sheets (SDS) for the chemical substances identified in the wastewater.

Depending on the risks involved, typical protective equipment may include:

  • Safety goggles or full-face protection.
  • Chemically resistant gloves appropriate to the identified contaminants.
  • Protective workwear.
  • Slip-resistant safety boots.
  • Hearing protection.
  • Respiratory protective equipment where inhalation hazards have been identified.

However, the primary safety objective should always be to minimise operator exposure through appropriate engineering controls and treatment system design.

How Can I Request a Hull-Cleaning Wastewater Treatment Assessment for My Slipway?

Simply provide us with a brief description of your shipyard operations, including the types and sizes of vessels serviced, maintenance activities performed, number of high-pressure washers, slipway configuration and applicable site-specific environmental requirements.

We will then coordinate wastewater sampling and laboratory analysis with you.

Based on the results, we will recommend a wastewater collection system, a suitable treatment process and the most appropriate mobile unit configuration for your operational needs.

About X’Pertus®

X’Pertus® designs and supplies water and wastewater management equipment for professional and industrial applications.

  • Our solutions include mobile washing and hull-maintenance areas, washwater recycling systems, oil-water separators, hazardous liquid containment equipment and sustainable mobility solutions.
  • Founded by François Rivalland, X’Pertus® is headquartered in Paris, France (8th arrondissement), and operates throughout France and internationally.
  • We support shipyards, ports, industrial operators, agricultural businesses and construction companies with tailored wastewater management and environmental protection solutions.

For our address, opening hours and directions, visit the X’Pertus® contact page.

Tell Us About Your Slipway — X’Pertus® Will Take Care of the Rest

No permanent concrete structures. No standardised treatment units. No unnecessary construction work.

Just your slipway, your high-pressure washing equipment and a wastewater treatment system engineered around your specific operational requirements.

 

Contact us

Ready to design your customised treatment solution together?